Werribee Mercy Hospital maternity wing, completed 2011

Victorian building & construction · Seaford · Family-owned

Family builders since 1935. Our own steel, our own plant.

Commercial builder for schools, hospitals, aged care and community buildings in Melbourne and the Mornington Peninsula

Mackie is a family-owned commercial builder in Seaford. We build and upgrade education, health and community buildings across Victoria, and our family has been in the business since 1935. We fabricate our own steel and run our own plant.

Werribee Mercy Hospital — Stage 1Maternity wing, built while the hospital stayed operational · Completed 2011

01 · Selected work

Recent work

All 90 profiles

Apartments & housing, including DHHS / Homes Victoria unitsAll sectors

02 · Occupied sites

Building while you stay open.

Hospitals and schools where we built while patients, students and staff stayed on site.

Frankston Hospital emergency department entrance
Frankston Hospital — staged upgrades delivered while the hospital remained operational.
Keysborough Secondary College — Administration and music

Occupied school

Keysborough Secondary College — Administration and music

Keysborough · Completed 2025

Partial demolition and construction of a new administration building, together with refurbishment of a music building at another campus. The school stayed open throughout the works.

Read the project
Karingal Primary School — New building

Occupied school

Karingal Primary School — New building

Frankston · Completed 2024

Replacement of an existing portable building with a multipurpose hall, general-purpose art classrooms, a fully equipped kitchen and amenities. The project also included landscaping and a basketball court. The school stayed open throughout the works.

Read the project
Boronia West Primary School — Classrooms and courts

Occupied school

Boronia West Primary School — Classrooms and courts

Boronia · Completed 2024

Demolition of existing buildings and construction of a new single-storey teaching building, including an art room with kiln facilities and amenities. External works included basketball and netball courts and associated landscaping. The school stayed open throughout the works.

Read the project
Syndal South Primary School

Occupied school

Syndal South Primary School

Completed 2024

Completed in 2024, this project adds to Mackie’s education construction portfolio. Archive views show the school exterior, internal circulation and reception spaces. The school stayed open throughout the works.

Read the project
Werribee Mercy Hospital — Stage 1

Operating hospital

Werribee Mercy Hospital — Stage 1

Werribee · Completed 2011

Construction of a new maternity centre, with antenatal, birthing and postnatal care, outpatient consulting and an emergency outpatient service, and a special-care nursery as a separable portion of the works. As the hospital remained operational during the works, a high level of coordination with hospital staff and engineers was required to keep the work safe.

Read the project
Frankston Hospital — Maternity expansion

Operating hospital

Frankston Hospital — Maternity expansion

Frankston · Completed 2012

Construction of a new maternity facility to increase capacity. A suspended floor on bored piers required extensive consultation with hospital engineers to locate existing services, so that the hospital could remain operational without the need to shut those services down.

Read the project

03 · Case studies

Six projects, set out in detail.

Explore the full portfolio

04 · The workshop

Our steel shop and plant.

In-house fabrication and owned plant, so key items can run on Mackie’s programme rather than a hire queue.

We fabricate our own steel stairs, portal frames, lintels and replacement steel, and items made from steel, stainless steel or alloys, in our own workshop, so those items are made to our programme.

  • M380D Favelle Favco tower crane
  • Komatsu and Volvo crane truck
  • 4WD backhoe
  • JLG knuckle boom
  • Ingersoll-Rand 6 tonne double smooth roller
  • Ingersoll-Rand 12 tonne smooth drum with sheep-foot shells
  • Merlo 4WD telescopic handler
  • Electric and all-terrain scissor lifts
  • Volvo tipper
  • As listed in the February 2026 credentials pack, which notes that the list is not exhaustive.

Read about the workshop

Mackie tower crane on a project siteSteel stock inside the Mackie workshopMackie crane truck

Mackie workshop, tower crane and crane truck · Mackie magazine, September 2017.

05 · Preconstruction & value

Two design changes that saved space and cost.

Two changes recorded in Mackie’s 2012 capability statement and repeated in the February 2026 credentials pack.

Preconstruction

HMAS Cerberus training facility

Mackie designed mezzanine classrooms over the teaching areas, using the volume of a building that had been scaled to match the adjacent historic buildings. This gained 200 m² for an additional cost of $50,000.

2012 capability statement and February 2026 credentials pack.

Preconstruction

Pier 9 Apartments, Patterson Lakes

Mackie recommended changing the external wall system from solid brick to precast concrete, and developed a system to prefabricate roofs and balconies on the ground and crane them into position. These changes expedited the programme, reduced the labour component, and increased worker safety.

2012 capability statement and February 2026 credentials pack.

06 · Across Victoria

Work across Victoria.

Profiles with a recorded suburb are pinned on the map. The rest stay in the library, off the map.

Open the full library
View Sector

Pins are placed by the suburb recorded in each project profile, not a surveyed site location. Base map from OpenStreetMap data. The black pin is the Seaford head office. Pins in the same suburb are spread slightly apart.

07 · Design and construct

Mackie, with MSM & Associates when required.

Mackie has delivered design-and-construct work, including the Mornington aged-care facility for Village Glen. Architectural and project-management support through MSM & Associates can be separately appointed. MSM & Associates is named on the same ISO 9001, 14001 and 45001 certificate as Mackie Pty Ltd.

Mornington Aged Care case studyView our credentials

Archive photograph identified as one of Mackie’s first construction projects, 1952
One of Mackie’s first projects · 1952 archive photograph, shown at its native size.

08 · Our heritage

A family business since 1935.

The family story begins in 1935, with a decorating business on Little Collins Street, Melbourne. A carpenter was engaged to build the showroom; that connection became a family partnership, and the decorating and building businesses grew together.

Mackie’s company credentials identify the photograph as one of the firm’s first construction projects, in 1952. The business is still owned and run by the family.

Read our story

09 · Credentials

Current certification and registration.

Full credentials page

ISO certified to 2028

ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018. Certified 4 July 2025. Expires 29 June 2028. Issued by Sustainable Certification Pty Ltd.

Unlimited builder registration

Registered as a commercial builder (unlimited), CCB-U 60808, and as a domestic builder (unlimited), CDB-U 60809, with renewal dated 28 November 2028.

CSR registered

Mackie is registered on the Victorian Government Construction Supplier Register (CSR). ABN 55 097 603 846. Head office at 6 Apsley Place, Seaford VIC 3198.

10 · Contact

Talk to us about a project or a tender.

New construction, a refurbishment or a programme of building upgrades. Tell us what you have in mind.

Call(03) 9781 4066

Visit6 Apsley Place, Seaford VIC 3198

Contact details